0″ TRAFFIC JAMS SINCE OCTOBER 2022:
SLUDGE RECIRCULATION IN HEAT EXCHANGER
WE HAVE REDUCED POWER CONSUMPTION BY 35 %.
In September 2022, we supplied 2 Vaughan pumps to replace 2 helicoidal pumps at the Tablada WWTP in Seville Application: sludge recirculation through heat exchanger
Flow rate: 50 – 60 m3/h
Pressure: 10 mca total PROBLEM: continuous clogging of the helicoidal pump. Initially, an in-line grinder had been installed, which also clogged and was then removed from the line. OUR SOLUTION:
Vaughan grinder pump, the ultimate solution.
- Unique and exclusive design
- 7 cut-off points
- 2 in 1: 1 grinder pump, replaces 2 units, 1 helicoidal pump and 1 in-line grinder
- We have reduced consumption: helical pump = 14 Amp, Vaughan grinder pump = 9 Amp.
- The most important thing: since the pumps were installed in October 2022, there have not been any bottlenecks.
Call us and ask us about your application. 938605454