{"id":14334,"date":"2023-11-22T13:00:54","date_gmt":"2023-11-22T13:00:54","guid":{"rendered":"https:\/\/www.raimaberfluidtech.com\/aguas\/blog\/tablada-wwtp\/"},"modified":"2023-11-22T13:00:54","modified_gmt":"2023-11-22T13:00:54","slug":"tablada-wwtp","status":"publish","type":"post","link":"https:\/\/www.raimaberfluidtech.com\/aguas\/en\/blog\/tablada-wwtp\/","title":{"rendered":"TABLADA WWTP"},"content":{"rendered":"

0″ TRAFFIC JAMS SINCE OCTOBER 2022: <\/strong><\/p>\n

SLUDGE RECIRCULATION IN HEAT EXCHANGER
\nWE HAVE REDUCED POWER CONSUMPTION BY 35 %.<\/strong><\/p>\n

In September 2022, we supplied 2 Vaughan pumps to replace 2 helicoidal pumps at the Tablada WWTP in Seville.<\/p>\n

Application: recirculation of sludge through heat exchanger
\nFlow rate: 50 – 60 m3\/h
\nPressure: 10 mca total<\/p>\n

PROBLEM: continuous clogging of the screw pump. Initially, an in-line grinder had been installed, which also clogged, and was then removed from the line. <\/p>\n

OUR SOLUTION:
\nVaughan grinder pump , the ultimate solution<\/p>\n