{"id":14334,"date":"2023-11-22T13:00:54","date_gmt":"2023-11-22T13:00:54","guid":{"rendered":"https:\/\/www.raimaberfluidtech.com\/aguas\/blog\/tablada-wwtp\/"},"modified":"2023-11-22T13:00:54","modified_gmt":"2023-11-22T13:00:54","slug":"tablada-wwtp","status":"publish","type":"post","link":"https:\/\/www.raimaberfluidtech.com\/aguas\/en\/blog\/tablada-wwtp\/","title":{"rendered":"TABLADA WWTP"},"content":{"rendered":"
0″ TRAFFIC JAMS SINCE OCTOBER 2022: <\/strong><\/p>\n SLUDGE RECIRCULATION IN HEAT EXCHANGER In September 2022, we supplied 2 Vaughan pumps to replace 2 helicoidal pumps at the Tablada WWTP in Seville.<\/p>\n Application: recirculation of sludge through heat exchanger PROBLEM: continuous clogging of the screw pump. Initially, an in-line grinder had been installed, which also clogged, and was then removed from the line. <\/p>\n OUR SOLUTION: Call us and ask us about your application.<\/p>\n 938605454<\/p>\n","protected":false},"excerpt":{"rendered":" 0″ TRAFFIC JAMS SINCE OCTOBER 2022: SLUDGE RECIRCULATION IN HEAT EXCHANGER WE HAVE REDUCED POWER CONSUMPTION BY 35 %. In September 2022, we supplied 2 Vaughan pumps to replace 2 helicoidal pumps at the Tablada WWTP in Seville. Application: recirculation…<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-14334","post","type-post","status-publish","format-standard","hentry","category-sin-categorizar"],"yoast_head":"\n
\nWE HAVE REDUCED POWER CONSUMPTION BY 35 %.<\/strong><\/p>\n
\nFlow rate: 50 – 60 m3\/h
\nPressure: 10 mca total<\/p>\n
\nVaughan grinder pump , the ultimate solution<\/p>\n\n
<\/p>\n